It took six weeks to put things back together for the first time during the sailboat refit II in Guatemala. The deck project is going well. After some touch-ups with fiberglass, two coats of polyester filler are applied to the deck. After an incredible amount of sanding, seven coats of gelcoat were sprayed on. Meanwhile, Alex rebuilt both toilets, relocated a thruhull, glued in new plastic seacocks, and tinkered with what felt like 100 side projects.